logo Use CA10RAM to get 10%* Discount.
Order Nowlogo
(5/5)

Find the maximum flood for each year of record, rank these floods from highest to lowest magnitude and calculate the log10 for each flood magnitude.

INSTRUCTIONS TO CANDIDATES
ANSWER ALL QUESTIONS

Before you start, you need to use two multipliers “1.X” and “1.Y”. “X” and “Y” are the fourth and fifth digits of your student ID. If any of the numbers (X, Y) is “0”, then use “05” instead, i.e. if your fourth digit is “0”, your “1.X” is “1.05”. 

Flow in an urban stream has been measured continuously using an automatic stream gauge between 31/07/1971 and 25/03/1996.  The maximum daily stream flow recorded each day during this period is provided in the file “Assignment 1 Data.xls”. In the file multiply the flow values with 1.X for the years 1971-84 and with 1.Y for the years 1985-96. As there are numerous data, it is recommended that you use Excel.

 

Do the following with your data:

Annual Series Flood Frequency Analysis

a) Find the maximum flood for each year of record, rank these floods from highest to lowest magnitude and calculate the log10 for each flood magnitude.

b) Calculate the mean (M), standard deviation (S) and coefficient of skewness (g) for each log10 flood value. In Excel, to calculate “M” use “=Average (…)” function, to calculate “S” use “=STDEV (….)” function and to calculate “g” use “=SKEW (…)” function.

c) Determine the frequency factors (Ky) for 50 years and 100 years ARI.  The frequency factors from Australian Rainfall and Runoff (2000) are also provided in the file “Assignment 1 Data.xls”. You may have to interpolate between the given values, to find the appropriate value for your “g”. 

d) Estimate flood discharges for 50 years and 100 years ARI using ‘Analytical method’ (Analytical equation provided in the lecture slides).

e) Rank each of these floods assigning “m” value (m=1 for highest flood and m=2 for the second highest flood and so on). Calculate the plotting position (for Annual Series Flood Frequency Analysis) for each flood event (Equation provided in the lecture slides). Plot them on a graph, in X-axis AEP (log scale) and in Y-axis flood values (normal scale).

f) Extend the graph and estimate flood discharges for 50 years and 100 years AEP using Graphical method. 

 

Partial Series Flood Frequency Analysis

g) Define a flood threshold and find the set of independent floods that exceed this threshold.  Set the threshold so that you have at least one flood for each year of record (i.e. extract all the annual maximum values, then the smallest value among all these values can be a threshold).

h) Rank each of these floods from highest to lowest magnitude, assigning “m” value (m=1 for highest flood and m=2 for the second highest flood and so on).

h) Calculate the plotting position for each flood event and plot on a graph, with the flood magnitude on the Y axis (normal axis), versus plotting position (ARI) on the X axis (log scale).  

i) Fit a line of best fit (Trendline in Excel) through the data values.  Adopt the logarithmic trendline, which should be a straight line on your graph.  Remember to include the trendline equation on the graph.

j) Estimate the 50 years and 100 years ARI discharges that you would expect in the stream.

k) Compare the 100 years ARI flood discharges estimated in different methods.

 

 

(5/5)
Attachments:

Related Questions

. Introgramming & Unix Fall 2018, CRN 44882, Oakland University Homework Assignment 6 - Using Arrays and Functions in C

DescriptionIn this final assignment, the students will demonstrate their ability to apply two ma

. The standard path finding involves finding the (shortest) path from an origin to a destination, typically on a map. This is an

Path finding involves finding a path from A to B. Typically we want the path to have certain properties,such as being the shortest or to avoid going t

. Develop a program to emulate a purchase transaction at a retail store. This program will have two classes, a LineItem class and a Transaction class. The LineItem class will represent an individual

Develop a program to emulate a purchase transaction at a retail store. Thisprogram will have two classes, a LineItem class and a Transaction class. Th

. SeaPort Project series For this set of projects for the course, we wish to simulate some of the aspects of a number of Sea Ports. Here are the classes and their instance variables we wish to define:

1 Project 1 Introduction - the SeaPort Project series For this set of projects for the course, we wish to simulate some of the aspects of a number of

. Project 2 Introduction - the SeaPort Project series For this set of projects for the course, we wish to simulate some of the aspects of a number of Sea Ports. Here are the classes and their instance variables we wish to define:

1 Project 2 Introduction - the SeaPort Project series For this set of projects for the course, we wish to simulate some of the aspects of a number of

Ask This Question To Be Solved By Our ExpertsGet A+ Grade Solution Guaranteed

expert
Um e HaniScience

856 Answers

Hire Me
expert
Muhammad Ali HaiderFinance

693 Answers

Hire Me
expert
Husnain SaeedComputer science

604 Answers

Hire Me
expert
Atharva PatilComputer science

656 Answers

Hire Me
April
January
February
March
April
May
June
July
August
September
October
November
December
2025
1950
1951
1952
1953
1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
SunMonTueWedThuFriSat
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
00:00
00:30
01:00
01:30
02:00
02:30
03:00
03:30
04:00
04:30
05:00
05:30
06:00
06:30
07:00
07:30
08:00
08:30
09:00
09:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
23:00
23:30